Building climatization
Large-area thermal management integrated with the building envelope.
ClimaStrat integrates building cooling, photovoltaic generation and atmospheric water recovery in a multifunctional building-envelope concept.
Explore the technologyContactA controlled 50 mm air gap guides ambient air along cooled panel surfaces. When the surface is below dew point, moisture condenses and is routed through integrated collection and drainage geometry. Photovoltaics are part of the envelope architecture.
Large-area thermal management integrated with the building envelope.
Condensate collection designed within the panel and drainage network, not an add-on gutter.
PV layers support the energy concept; output depends on location and operation.


A 2017–2019 pilot demonstrator in Hungary established the physical condensation principle. Water yield and energy performance were not measured to the standard required for a commercial claim. Subsequent numerical studies investigated thermodynamics, finite film inventory, collector backpressure, outlet resistance and parallel drainage branches.
2017–2019 pilotAP 3.12.57–63 hydraulic screeningCS_DRAINAGE_R1Reference conditions: 10,000 m² active building envelope, Jeddah TMYx/EPW weather, 18 °C surface temperature, 50,000 m³/h airflow and a 50 mm CS-Gap. These are simulation outputs, not measured plant performance.
6,259 h/year cooling load; approximately 664 MWh/year cooling electricity at assumed COP 4. These values reflect the submitted presentation's reference scenario and are not independently verified measurements. Gross condensate must not be presented as net collected water.


The economic proposition is shared building-climatization infrastructure rather than a dedicated water generator. The figures in the submitted GPIW presentation are concept-level estimates and require pilot-based validation, including transparent allocation of cooling electricity and water-specific auxiliary loads.
The deck also quotes an incremental LCOW of approximately €6.95/m³. This is a preliminary model estimate with assumptions not yet validated by a pilot; it is not an offer or guaranteed cost.
Pilot demonstration in Jeddah: measure water yield, electrical demand, airflow, water quality and reliability.
Standardize and validate the panel, integrated drainage, controls and manufacturing design.
Expand through local implementation partners, beginning with hot and humid building markets.

The GPIW presentation features Stefan Kaszian and Peter Kaszian. Peter Kaszian is the Managing Director of Lysicorp GmbH as well as the inventor and technical lead for ClimaStrat.
Patent territorial coverage, grant status and ownership are subject to document verification before separate publication.

We welcome dialogue with building operators, water-technology specialists, research partners and pilot-site hosts.
info@lysicorp.de