Lysicorp GmbH · GPIW 2026 project

Turning Building Climatization into a Local Water Resource

ClimaStrat integrates building cooling, photovoltaic generation and atmospheric water recovery in a multifunctional building-envelope concept.

Explore the technologyContact
01 / Technology

One building envelope. Multiple benefits.

A controlled 50 mm air gap guides ambient air along cooled panel surfaces. When the surface is below dew point, moisture condenses and is routed through integrated collection and drainage geometry. Photovoltaics are part of the envelope architecture.

Building climatization

Large-area thermal management integrated with the building envelope.

Atmospheric water recovery

Condensate collection designed within the panel and drainage network, not an add-on gutter.

Renewable electricity

PV layers support the energy concept; output depends on location and operation.

ClimaStrat panel architecture and building envelope illustration
Source: submitted 2026 GPIW pitch deck. Illustrations reproduced from the presentation; some are AI-generated concept visualizations. · Slide 3
02 / Evidence

From demonstrated condensation to instrumented validation

ClimaStrat historical pilot demonstrator and proposed pilot stages
Source: submitted 2026 GPIW pitch deck. Illustrations reproduced from the presentation; some are AI-generated concept visualizations. · Slide 6

A 2017–2019 pilot demonstrator in Hungary established the physical condensation principle. Water yield and energy performance were not measured to the standard required for a commercial claim. Subsequent numerical studies investigated thermodynamics, finite film inventory, collector backpressure, outlet resistance and parallel drainage branches.

2017–2019 pilotAP 3.12.57–63 hydraulic screeningCS_DRAINAGE_R1
Engineering evidence status: numerical screening and a historical condensation demonstrator. No validated commercial net-water yield, potable-water certification or engineering release is claimed.
03 / Jeddah reference case

Jeddah reference case — modelled performance

Reference conditions: 10,000 m² active building envelope, Jeddah TMYx/EPW weather, 18 °C surface temperature, 50,000 m³/h airflow and a 50 mm CS-Gap. These are simulation outputs, not measured plant performance.

≈ 1,410.84m³/year gross condensate
≈ 3,865L/day gross average
≈ 2,654MWh thermal cooling/year
≈ 0.4706kWh/L fully allocated cooling electricity (COP 4)
Concept estimate, not measured

6,259 h/year cooling load; approximately 664 MWh/year cooling electricity at assumed COP 4. These values reflect the submitted presentation's reference scenario and are not independently verified measurements. Gross condensate must not be presented as net collected water.

GPIW presentation Jeddah reference case modeled performance
Source: submitted 2026 GPIW pitch deck. Illustrations reproduced from the presentation; some are AI-generated concept visualizations. · Slide 8
04 / Economics

Economics: cooling and water as co-products

ClimaStrat GPIW economic co-product concept
Source: submitted 2026 GPIW pitch deck. Illustrations reproduced from the presentation; some are AI-generated concept visualizations. · Slide 11; concept estimates, not verified project costs

The economic proposition is shared building-climatization infrastructure rather than a dedicated water generator. The figures in the submitted GPIW presentation are concept-level estimates and require pilot-based validation, including transparent allocation of cooling electricity and water-specific auxiliary loads.

€827,800concept CAPEX in deck
€60,000deck water-specific CAPEX estimate

The deck also quotes an incremental LCOW of approximately €6.95/m³. This is a preliminary model estimate with assumptions not yet validated by a pilot; it is not an offer or guaranteed cost.

05 / Implementation

Development pathway

01

Pilot demonstration in Jeddah: measure water yield, electrical demand, airflow, water quality and reliability.

02

Standardize and validate the panel, integrated drainage, controls and manufacturing design.

03

Expand through local implementation partners, beginning with hot and humid building markets.

ClimaStrat GPIW development roadmap
Source: submitted 2026 GPIW pitch deck. Illustrations reproduced from the presentation; some are AI-generated concept visualizations. · Slide 7
06 / Lysicorp

Development team

The GPIW presentation features Stefan Kaszian and Peter Kaszian. Peter Kaszian is the Managing Director of Lysicorp GmbH as well as the inventor and technical lead for ClimaStrat.

Patent territorial coverage, grant status and ownership are subject to document verification before separate publication.

Lysicorp ClimaStrat team as shown in GPIW pitch deck
Source: submitted 2026 GPIW pitch deck. Illustrations reproduced from the presentation; some are AI-generated concept visualizations. · Slide 12
07 / Collaboration

Discuss a pilot or technical collaboration

We welcome dialogue with building operators, water-technology specialists, research partners and pilot-site hosts.

info@lysicorp.de